Answered · Skylight & Rooflight Installation & Replacement Chelmsford

How far in advance should I book?

The short answer

For a straightforward job with a standard sized unit, four to six weeks between agreeing the quote and the crew arriving is a fair expectation. For anything with a structural opening, a made to measure unit or a consent attached to it, plan on eight to twelve weeks and sometimes longer.

Those numbers are the sum of two separate waits that people tend to merge into one: the wait for the product to be manufactured and delivered, and the wait for a slot in the installation diary. They run partly in parallel, but they are governed by different things and it helps to think about them separately.

The two lead times that make up the wait

Product lead time is set by the manufacturer. A stock size roof window from a national brand is usually available within a week from a merchant. A made to measure flat rooflight is built to order, and four to eight weeks is normal. A large lantern with a special glass specification can be ten or more.

Diary lead time is set by the season and by the length of the job. A single day roof window slots into gaps easily. A three day lantern installation needs a clear run of settled weather and a crew, which is harder to place at short notice. The critical path is whichever of the two is longer, and for anything made to order it is almost always the product.

Grid sizes and bespoke units, and what each does to the lead time

This is the single biggest lever you have on the timeline. Roof window manufacturers work to a fixed size grid, and a unit on that grid is normally on a shelf somewhere in the region.

Flat rooflights are different. Most are made to the millimetre for the kerb they are landing on, which means nothing is ordered until the kerb is either built or precisely dimensioned. That sequencing is unavoidable, because ordering a bespoke unit off a drawing and then finding the kerb was built ten millimetres out is a very expensive way to save a fortnight.

Structural work, and the weeks it adds

Where an opening is wide enough to need a steel, a structural engineer produces a calculation before anything is ordered. That is typically one to two weeks from instruction to drawing, and it has to happen before the Building Control conversation is complete.

Steel fabrication adds another one to three weeks depending on the section and the fabricator. So a lantern needing a beam realistically sits at ten to fourteen weeks from first enquiry to a finished ceiling. The work itself is a handful of days. The paperwork and the fabrication account for nearly all of the elapsed time.

Season, and the parts of the year that fill first

Spring and late summer are the busiest periods, for the obvious reason that people commission work when the weather looks reliable and when extensions are reaching the roof stage. March through June and September into October fill earliest.

January and February have more availability than people expect. Rooflight installation is not weather dependent in the way roof recovering is, because the opening is formed, weathered and closed within a single working day. The specific question of cold weather working is dealt with on the winter fitting page. Booking a February slot in November is often the shortest wait available all year.

Booking around an extension programme

On a new extension the rooflight is one trade among several, and the sequencing has two fixed points that matter far more than the booking date.

The first is design, when the size and position of the opening are agreed, because the builder forms the structure around them and that cannot be revised once the roof is up. The second is first fix, when a cable for an electric opener costs almost nothing to run and a great deal to add later. Get a survey booked as soon as the roof structure is up and the kerb is formed, and the unit can be ordered while the builder is still working.

The date worth fixing early is the survey, not the installation.

Replacing a unit that has failed

A misted or tired unit does not always wait politely for a diary slot, and the timeline here depends entirely on the kerb.

A like for like replacement into an existing kerb, using a size that is on the grid, can often be done inside two to three weeks. A replacement where the old unit was an odd imperial size, which covers a great many of the domed units fitted across Essex in the seventies and eighties, needs a made to measure unit and returns to the four to eight week product lead time. Measuring the existing opening early is what tells you which of the two you are in.

A rough calendar, front to back

The table below assumes the survey happens promptly after the initial enquiry, which is normally the case.

Job type Enquiry to installation What sets the pace
Roof window, standard size, pitched slope 3 to 5 weeks Diary availability
Flat rooflight, made to measure, existing kerb 5 to 8 weeks Manufacture
Sun tunnel through a loft 3 to 4 weeks Diary availability
Lantern on an existing flat roof, no steel 6 to 10 weeks Manufacture
Large opening needing a steel 10 to 14 weeks Engineer and fabrication
Conservation unit needing consent 14 to 20 weeks Determination period

What you can do now to shorten it

Three things help more than anything else. Measure the existing opening or the intended one and photograph the roof from outside and the ceiling from inside, which is enough for a range by email straight away. Check the listing and the conservation area status before design work starts, because that is the longest pole in the tent. And decide early whether the unit opens and whether it is electric, since both are order decisions rather than site decisions.

Sunspire surveys, installs and handles the Building Control notification as part of the job across Chelmsford and thirty miles around it. The wider picture of how a rooflight installation is put together sits on rooflight and skylight installation in Chelmsford, and indicative ranges by job type are on the costs page.

Get a quote

Tell us about your roof

We start with the building, the covering and the slope. Then we tell you what will suit it, and what it will cost, as a fixed written number.

  • Surveyed before it is priced
  • 10-year workmanship guarantee
  • Building Control notification handled
  • New installations and replacements
Get a quote Call us