Costs

How we price, and how to read a quote

Two figures: a range by email, then a fixed written price after a survey. This page explains what moves the number, and gives you a way to check any quotation you are holding, including ours.

How pricing works

Two figures, and the second one is fixed

01

A range, by email

From four answers: which town, what the roof is covered with, roughly which way the slope faces, and the approximate size of the room below. It is a range because nobody has been on the roof yet, and anyone giving you a single figure at this stage is guessing.

02

A fixed price, after a survey

Written, itemised, and firm. It names the unit, the glazing, the structural work and who is making good. If the survey turns something up inside the roof, you hear about it before anybody proceeds, not on the final invoice.

What actually moves it

The seven things that decide the number

In rough order of how much they swing a job. Size is the obvious one and it is not the biggest.

DriverEffectWhy
Access and scaffoldLargeA rear extension roof off a garden is straightforward. A third floor slope over a narrow side return is a scaffold, and scaffold is priced by the week.
StructureLargeBeyond roughly 1.5m the load has to go somewhere. A steel brings a calculation, a longer programme and a different Building Control conversation.
SizeLarge, and not linearPast about 1.5m in either direction the glass becomes a special rather than a stock size, and the step is a jump rather than a slope.
Roof coveringModerateRe-laying hand-made clay tiles around an opening is slower and more skilled than dressing a single ply membrane.
Glazing specificationModerateSolar control, triple glazing, laminated or acoustic panes each add. Specified for the orientation, not for the brochure.
Making goodModerateA splayed reveal costs a little more plastering than a square one and roughly doubles the apparent opening. It is the commonest difference between two quotes.
Opening or fixedSmallerAn actuator, a rain sensor and the wiring, or a manual opener. Real, but rarely the thing that decides a job.
Work it out

Size a rooflight for your room

Put in the room and the roof. This applies the same rules a survey starts from: glazing area against floor area, then the glass specified for the way the roof faces.

m
m
Glazing area to aim for 0.6 to 0.8 m² 15 to 20% of a 20.0 m² floor
Suits
Glass
Watch for

Get this priced See the units

The rule this uses
Floor areaGlazing at 15%Glazing at 20%
12 m²1.8 m²2.4 m²
16 m²2.4 m²3.2 m²
20 m²3.0 m²4.0 m²
25 m²3.8 m²5.0 m²
30 m²4.5 m²6.0 m²

The ratio moves up for a deep room with one external wall, and down for a small south facing room where the same area would overheat it. Orientation decides the glass: north takes neutral glazing, south and west want solar control.

Compare what you have been sent

Check a quotation against this list

Tick what your quotation actually names. Anything left unticked is either included and unstated, or not included at all, and those two cost very different amounts. Use it on ours as well.

Named in your quote 0 of 10

Work down the list with your quotation beside you.

Get a quote that names all ten

A range by email, then a fixed written figure

Sunspire quotes twice. First a range by email, once the basics are known. Then a fixed written figure after a survey, which is the one that goes on the contract and does not move unless you change what you have asked for.

The reason for two is that the second depends on things nobody can see from a photograph. A range is honest about that uncertainty rather than hiding it: wide enough to contain the likely outcomes, narrow enough to tell you whether the project is the right order of magnitude for what you had in mind.

What the emailed range is built from

Five things get you a useful range. Which town, because access and travel differ across the county. What is on the roof, because clay, concrete, slate and a single ply membrane are four different amounts of labour. Roughly which way the slope faces, because that drives the glass. The approximate size of the room below, which sets a sensible glazing area. And a photograph of the roof from outside plus the ceiling from inside.

Those two photographs do more work than any description. The outside one shows the covering, the pitch, the ridge and whether there is anywhere to stand. The inside one shows the ceiling line and often reveals a truss or a boxed duct that changes the answer entirely.

Size, and the point where the line bends

Size is the biggest single driver and the one most often misunderstood, because people assume a rooflight twice the area costs twice as much. It does not. The line runs fairly gently up to about a metre and a half in either direction, then it bends sharply.

Two things happen at that threshold at once. The glass leaves the range of standard sizes held in stock and becomes a made to order special, priced and lead-timed differently. And the opening gets large enough that timber trimming stops being adequate, so the structure has to be designed rather than assumed. Both are a step rather than a slope, which is why a modest reduction in a stated dimension sometimes produces a disproportionate saving.

On a roof that has not been built yet, landing the opening on a standard glass size is usually free: the trimmers simply go in a little further apart or closer together. On an existing roof it is rarely worth altering structure to chase one, because the cutting costs more than the glass saves.

Access, and when scaffold joins the job

Access is the driver people forget, and on some jobs it moves the figure more than the glass does.

A single storey rear extension reached across a level garden is straightforward: a tower goes up, material goes over, waste comes down. A second or third storey slope, a roof over a narrow side return with a neighbour’s fence against it, or anything where the only route runs through the house changes that. Scaffold carries a hire period as well as an erection cost, and it brings its own lead time. A garden reached only through a kitchen is doing quiet work on the price long before anyone discusses glass.

Structure, and what a steel brings with it

Where an opening is large enough to need a steel, the beam is rarely the expensive part. What comes with it is.

A structural engineer produces a calculation and Building Control wants to see it. The beam has to be got into position, which on a first floor with restricted access can mean craning or splitting the work. Padstones may be needed where it bears. The programme lengthens, and a longer programme carries more days of everything else. This is the single largest fork in a rooflight budget, which is why it is established at survey rather than on the second morning.

The covering, and the labour of making it good

The perimeter of the opening has to be made watertight in whatever material is already on the roof, and those materials are not equal in labour.

Covering What making good involves Effect on labour
Single ply, felt or GRP Membrane dressed up the kerb and terminated under the unit Lowest, done as one operation
Concrete interlocking tile Deep profile kit, tiles cut and re-hung around the opening Moderate and predictable
Natural slate Low profile kit, slates cut and re-hung, fixings replaced Higher, slate is brittle and unforgiving
Plain clay tile, hand made Soakers dressed between courses, tiles matched by hand Highest, and matching stock takes time

On older Essex stock the matching problem is real. Hand made clay tiles vary in size and colour by batch, and reclaimed tiles have to be sorted before they are laid. That is skilled time, and it is why the same rooflight in two identical rooms can carry different figures because one house was re-roofed in the eighties and the other never was.

Glazing specification, the choice with the widest spread

The specification of the sealed unit itself has a wider spread than any other single line, because it is where a plain double glazed unit and a solar controlled, laminated, asymmetric, triple glazed one sit at opposite ends of the same catalogue.

Each step up buys something specific. Solar control glass holds down summer heat gain on a south or west facing plane and on any flat roof. Laminated outer glass reduces rain noise and improves security where the roof is reachable. A warm edge spacer lifts the temperature at the edge of the glass, which is where condensation starts. None of these can be added later, which is why an unusually low figure is worth reading for what the glass is rather than what it costs.

The internal reveal and the trades that follow

The glass is only half of what the room sees. The other half is the reveal, the lining between the ceiling and the frame, and it wants settling at quotation stage rather than at handover.

A square reveal is quicker to form and throws a hard rectangle of light on the floor. A splayed one, opening outwards towards the room, spreads light across the ceiling and makes the opening read as considerably larger. It costs a little more plastering time and nothing in glass. What matters for the figure in front of you is who is carrying it: whether the quotation includes forming and plastering the reveal, or leaves a plasterer to be found.

Notification, and why it belongs inside the price

Fitting a new rooflight or replacing an existing one is notifiable work under Building Regulations in England. It engages Part L for thermal performance, Part K where there is a risk of falling and Part B where the opening serves as a means of escape. There is a fee, and there is administration.

Sunspire handles the notification as part of the job and it sits inside the quoted figure. That matters more than the amount involved, because unnotified work surfaces years later during a sale, when a solicitor asks for a completion certificate that was never applied for.

What the fixed written price sets out

After the survey the range becomes one figure, in writing, itemised. It names the unit by manufacturer, model, external size, glazing specification with its U-value, and frame finish. It states what structural work is included and what calculation sits behind it. It says who forms the opening and who makes good the plaster. It confirms the notification is included. It puts a figure against access and against waste. And it sets out the programme in days.

That figure holds unless the scope changes. Changing the glass, moving the opening or adding an opener after agreement are changes, and they are re-priced openly rather than recovered somewhere quieter.

Comparing two quotations that look nothing alike

The most common frustration is holding two figures that differ substantially and having no idea why. Almost always the answer is in one of five places.

  • The unit. One is a standard size in stock glass, the other is a special with solar control and lamination.
  • The structure. One has priced a steel and a calculation, the other has assumed timber trimming will do.
  • The reveal. One finishes and decorates it, the other leaves a hole with a frame in it.
  • The access. One has included scaffold with a realistic hire period, the other has assumed a ladder.
  • The notification. One has included it, the other has left it with you without saying so.

Line those five up side by side and the gap usually explains itself. Where a figure sits far below the others and nothing on that list accounts for it, the missing item is on the roof rather than on the page.

A single line reading “supply and fit rooflight” against a number is not a quotation, it is an invitation to a conversation on the day.

What can move a price after it is agreed

Two things, and being straight about both is easier than the alternative.

The first is a change you ask for: a different glass, a bigger unit, an opener added late. That is priced before it is done. The second is what the roof was hiding. Timber gone soft under an old kerb, a truss where a rafter was expected, or a fall that has flattened out over thirty years. A careful survey finds most of that in advance, but a roof is only fully honest once it is open. Where something does appear, it is shown to you, explained and priced before further work happens.

Decisions that cost nothing now and a great deal later

Three choices are free at design stage and expensive afterwards. Landing the opening on a standard glass size. Running a cable for a powered opener while the ceiling is open, since doing it later means lifting a finished ceiling. And ordering blind provision with the unit, because the side channels a rooflight blind runs in are part of the frame rather than an accessory.

For a first range, send the town, the covering, the orientation, the rough room size and the two photographs. If you are earlier than that, read the guides on sizing and specification first, because the decisions taken there set the figure.

Get a quote

Tell us about your roof

We start with the building, the covering and the slope. Then we tell you what will suit it, and what it will cost, as a fixed written number.