Chelmsford localities

Rooflight installation in Moulsham

Inner suburb, Edwardian and interwar terraces. What that means for getting glass into a roof here is the whole of this page.

We travel to Moulsham 10-year guarantee
Daylight from a single large rooflight over a kitchen extension
MoulshamTown covered
Chelmsford localitiesWithin
30Mile radius by road
10Year workmanship guarantee
In Moulsham

What we install on Moulsham roofs

Roof Lantern Installation

Flat-roof glazing sized to the room and detailed into the kerb below it.

View this service →

Flat Roof Rooflight Installation

Flush and kerb-mounted units into single-ply, felt and GRP flat roofs.

View this service →

Roof Window Installation

Roof windows trimmed into slate, clay and concrete tile without proud flashing.

View this service →

VELUX Window Installation

We install VELUX alongside Fakro, Keylite and Roto roof windows.

View this service →

Electric and Opening Rooflights

Actuated opening units, rain sensors and controls, wired and commissioned.

View this service →

Energy Efficient Rooflights

Specified on U-value and g-value, not on the brochure photograph.

View this service →
The local detail

16 things worth knowing about Moulsham roofs

Moulsham is the part of Chelmsford where the streets were laid out before the car, and that shows on every roof job in it. The older streets running off Moulsham Street and New London Road are close packed, mostly Edwardian and late Victorian, with narrow frontages and continuous roof runs shared between four or six houses at a time. Further out, the interwar streets loosen up. Further out again, Moulsham Lodge is a planned postwar estate with a completely different roof.

The layout matters more here than in the outer villages. Access, boundaries and what the street can see decide as much as the covering does. Sunspire fits new rooflights across all three parts of Moulsham and replaces units that have come to the end of their working life, travelling to the plot.

  1. 01 Three ages of Moulsham, and the roof that goes with each
  2. 02 Bay fronted terraces and their roof geometry
  3. 03 What the street can see, and where consent bites
  4. 04 Headroom, purlins and collars in an Edwardian loft
  5. 05 Dormer or rooflight in a Moulsham conversion
  6. 06 The escape route once the loft becomes a bedroom
  7. 07 Where two terrace roofs meet at the boundary
  8. 08 Chimney stacks and the clearance they need
  9. 09 Scaffolding a street with no rear access
  10. 10 Highway licences and the working day on a Moulsham street
  11. 11 Moulsham Lodge and the postwar estate roof
  12. 12 Flat roofs over Moulsham additions and garages
  13. 13 Light in a narrow room
  14. 14 Which way the Moulsham streets face
  15. 15 Notification, and the paperwork a sale asks for
  16. 16 What a Moulsham survey records, and how the price lands

Three ages of Moulsham, and the roof that goes with each

The pattern is legible from the pavement. Late Victorian and Edwardian terraces close to Moulsham Street, with steep pitches, natural slate or small plain tile, and a back addition running off the rear. Interwar semis and short terraces beyond them, hipped, at a generous pitch, under a clay or early concrete tile. Then Moulsham Lodge, built from the late nineteen forties, laid out with open frontages and covered in a large format interlocking tile at a much shallower angle.

Each of the three sets a different limit. The Edwardian roofs limit you on access and on what the street can see. The interwar roofs are the most forgiving. The Lodge estate roofs limit you on pitch.

Bay fronted terraces and their roof geometry

The classic Moulsham terrace has a bay to the front, a steep main roof running front to back across the whole terrace, and a lower two storey back addition. Main pitches sit around forty to forty five degrees, which is generous.

That steepness is an advantage and a complication at once. A flashing on a forty five degree slope is working comfortably within its design, so the weathering is rarely the difficult part. What is difficult is that a steep pitch and a narrow plan mean the roof space is tall and thin. A window low on the slope gives a view out; the same window a metre higher gives a bright ceiling and nothing else. That decision is made on the section drawing, not on the elevation.

A roof lantern on the flat roof of a single storey rear extension
A roof lantern on the flat roof of a single storey rear extension

Headroom, purlins and collars in an Edwardian loft

Before any of the exterior questions matter, the loft has to be capable of carrying a room. Edwardian roofs here are cut, with a purlin partway up each slope and often a collar tying the rafters near the top.

The purlin is the thing to look at. It usually sits at about the height a person’s shoulder would be if they stood beside it, and it can be repositioned or supported differently as part of a conversion, but not ignored. The collar sets the ceiling height at the centre. Where a room is being formed, a rooflight is placed in the slope below the purlin so the reveal lands on the sloping ceiling rather than being interrupted by a timber crossing it.

Dormer or rooflight in a Moulsham conversion

Both work on this stock and they solve different problems. A rooflight adds daylight without changing the outline of the building, keeps the roof plane unbroken, and installs in a day.

A dormer adds floor area with full standing height, which a rooflight cannot do. The usual outcome on a Moulsham terrace is a rear dormer for headroom and a rooflight in the front slope for light and for the escape route, since the front slope is where consent is tightest and a flush unit is what will be accepted there. Where the loft is being left as a loft rather than converted, one or two roof windows in the rear slope is the whole job.

The escape route once the loft becomes a bedroom

Turning a Moulsham loft into a habitable room brings Part B into play, and on a terrace it is more involved than on a detached house because the escape route runs down through the building.

Where a window serves as the means of escape it needs a clear opening large enough to climb through with neither dimension too small, and the bottom of that opening has to sit low enough above the finished floor to be usable. On a steep Edwardian slope that is achievable, which is one of the few places the geometry here helps. A top hung unit that swings clear of the opening is the usual choice, and it is specified at design stage because the escape unit cannot be swapped in later without redoing the reveal.

The escape window is a structural decision, so it belongs on the drawing rather than in the second fix.

Where two terrace roofs meet at the boundary

A Moulsham terrace roof is one continuous covering crossing several ownerships, usually with a party wall running up to or just above the tiles. That has a practical consequence for a rooflight.

An opening needs a working margin of covering between its frame and the wall so the side flashing has something to sit on and be dressed into. Placing a unit hard against a boundary leaves nowhere for that flashing to go. In practice the unit is set at least a couple of tile widths clear of the party line, which usually means it sits slightly off centre in the room below. Splaying the internal reveal towards the middle of the room recovers most of that visually.

Essex roof planes, with one rooflight sitting flush in the covering
Essex roof planes, with one rooflight sitting flush in the covering

Chimney stacks and the clearance they need

Moulsham roofs still carry a lot of stacks, either on the party line or at the gable, and they occupy exactly the part of the slope people tend to want.

Two clearances apply. Horizontally, the unit needs enough tiling between its frame and the stack for a side flashing and for the stack’s own lead soakers to run past without conflict. Vertically, a rooflight below a stack sits in the path of water shedding off the stack’s back gutter, so it wants to be well clear of that flow rather than immediately under it. Where a stack is redundant and being taken down, doing that before the rooflight goes in makes the roof simpler and the finished slope tidier.

Scaffolding a street with no rear access

This is the single biggest difference between working in Moulsham and working in the outer villages. A large number of the older terraces have no vehicle route to the rear at all, and sometimes no pedestrian route either beyond a shared alley.

Where that is the case, a rear scaffold is built from the front, carried through a shared entry or over a garden wall, and the same is true of every tile, every length of timber and every bag of waste. It is entirely normal work and it takes longer than a plot with a driveway. It is established at survey and priced then, because access is the line item that varies most across this postcode.

Highway licences and the working day on a Moulsham street

A scaffold standing on a public footway needs a licence from the highway authority, and on the busier Moulsham streets a permit or suspension may be needed for the vehicle that delivers it.

That takes lead time, so it is applied for once a date is agreed rather than in the week of the install. Parking is the other constraint. On streets with residents’ parking and no off street space, materials are delivered to a timed slot and the working day starts around it. None of this changes the roof work. It changes the calendar, and a date given before the licence is in hand is not a real date.

Moulsham Lodge and the postwar estate roof

Moulsham Lodge is a different build entirely: laid out from the late nineteen forties, with open frontages, shallower roofs and a large format interlocking concrete tile. Pitches commonly sit between twenty two and thirty degrees, well below the terraces up the road.

That pitch is usually still within the range a centre pivot roof window is warranted for, but it is closer to the limit, so the flashing kit and the apron length matter more. The tiles themselves are now decades old, and concrete of that age loses its surface and starts to fret. Tiles lifted around an opening often will not go back, so matching stock is set aside from a discreet area of the slope before the opening is formed.

A rooflight finished flush into the slate roof of a rear extension
A rooflight finished flush into the slate roof of a rear extension

Flat roofs over Moulsham additions and garages

Almost every part of Moulsham has flat roofs somewhere: over back additions on the terraces, over kitchen extensions on the interwar semis, and over the attached garages and stores on the Lodge estate.

These are typically small, often between six and fifteen square metres, and a small roof is unforgiving about drainage. A flush unit sits on a kerb built to one hundred and fifty millimetres above the finished surface, which is the sum of how deep water can stand before it finds an edge and how far wind can drive it up a vertical face. On a small roof draining to a single outlet, a unit dropped centrally sits across the flow line, so the position is worked out from the drainage and the firrings adjusted where the position has to win.

Light in a narrow room

A two up two down through room in Moulsham is often only three and a half metres wide with windows at one end. Daylight falls off quickly with depth, and the middle of the room is the part that never gets any.

Overhead glass fixes that in a way a wall window cannot, because a rooflight sees the whole dome of the sky rather than a slice of it. The working rule is glazing at fifteen to twenty per cent of the floor area below, and in a narrow room it is better spent as two smaller openings spread along the length than as one large one at the far end. Two units also keep the structural intervention smaller, which matters when the joists run the short way across a narrow plan.

Which way the Moulsham streets face

The older street grid runs in a fairly consistent direction, so a whole terrace tends to share an aspect and neighbours can compare notes usefully. The Lodge estate curves, so it does not.

Rear slope or roof faces What the room gets Specification call
North east Even light, no direct glare Neutral glass, larger area workable
South east Bright mornings, settled afternoons Neutral to light solar control
South west Long afternoon gain in summer Solar control glass, blind ordered with the unit
Flat roof over a back addition Sky from horizon to horizon, no shading Solar control as standard, opening unit for heat release

Notification, and the paperwork a sale asks for

New rooflights and replacements are notifiable work under Building Regulations in England. Part L covers thermal performance, Part K applies where there is a risk of falling, and Part B applies where a unit serves as escape from a habitable room.

Sunspire handles the notification as part of the job. On a terrace there is a second piece of paperwork worth thinking about early: work affecting a party wall, or excavation near one, can trigger a notice to the neighbour. A rooflight on its own usually does not, but a loft conversion that puts new beams into a party wall does, and the two projects tend to arrive together.

Lead flashing dressed into the slate around a rooflight frame
Lead flashing dressed into the slate around a rooflight frame

What a Moulsham survey records, and how the price lands

A range is given by email from photographs and a measurement. A fixed price follows a survey, because on this stock the access and the boundary conditions are worth more than any guess made from a photograph.

The survey records the covering and its condition, the measured pitch, the purlin and collar positions, the party wall line, the internal ceiling height, the orientation, and the route materials will take in and out. The recurring finds here are a rear slope with no scaffold route, a stack sitting exactly where the light was wanted, and a back addition flat roof laid with no usable fall. Moulsham sits with the rest of the county on the areas we cover page, and the costs guide sets out what moves a job from the range to the fixed figure. The roof is closed and watertight at the end of every working day.

Get a quote

Tell us about your roof

We start with the building, the covering and the slope. Then we tell you what will suit it, and what it will cost, as a fixed written number.

  • Surveyed before it is priced
  • 10-year workmanship guarantee
  • Building Control notification handled
  • New installations and replacements
Get a quote Call us