Guide · VELUX Window Installation

Roof window escape openings and the rules

16 sections 9 minute read

An escape opening is a window that a person can get out of, and a firefighter can get into, without equipment. In a roof slope that turns into a small set of numbers: a clear openable area of at least 0.33 square metres, at least 450 millimetres in both height and width, with the bottom of that openable area no more than 1100 millimetres above the floor.

Those figures come from Approved Document B, and they are the reason a loft conversion in Chelmsford ends up with a particular window in a particular position rather than the one somebody liked in a showroom. This page sets out which rooms need an escape opening, how the clear area is actually measured on a sloping plane, and what that does to the choice of unit. The installation process itself sits on the VELUX window installation page.

Which rooms the requirement attaches to

Not every room needs one. The requirement bites on habitable rooms in a storey between about 1.5 and 4.5 metres above ground level, which in an ordinary house means first floor bedrooms and any room in a single-storey loft conversion that sits inside that height band.

It also attaches to inner rooms, meaning a habitable room whose only way out is through another room. A loft study reached through a bedroom is an inner room, and it needs either its own escape opening or a route that does not depend on the space next door being passable.

15° Roof window Below 15 degrees most units are not warranted for weathering
Pitch decides which units are permitted. Most roof windows want 15 degrees as a minimum; below that the manufacturer will not warrant the weathering.

The three numbers, and the order they are checked in

The area comes first: 0.33 square metres of unobstructed opening, with the sash held clear of it. Then the two dimensions: neither the height nor the width of that clear opening may be less than 450 millimetres, so a long thin slot of the right area still fails.

Then the height above the floor. The bottom of the openable area sits no more than 1100 millimetres above finished floor level, and for roof windows the working band is 600 to 1100. Below 600 the opening becomes a low-level hazard in its own right, and above 1100 it stops being something a person can climb through under pressure.

A window that meets the area but misses the 450 minimum in one direction is not an escape opening, whatever the brochure calls it.

What counts as clear opening on a sloping plane

This is where roof windows differ from wall windows, and where most of the confusion comes from. The clear opening is measured on the plane of the opening itself, not on the horizontal, and it is the aperture left once the sash has swung out of the way.

On a top-hung escape sash that means the full daylight opening of the frame, because the sash lifts entirely clear. On a unit where the sash only partly clears, the usable rectangle is whatever is left between the frame and the underside of the sash, which can be far smaller than the glass area suggests. The figure that matters is the one the manufacturer publishes for the escape function, not the one on the size chart.

Which mechanisms can hold a sash out of the way

Three arrangements do the job. A conventional top-hung sash that opens to around forty five degrees leaves the aperture clear. An escape-hinged unit starts life as a centre-pivot window and releases, on a catch, into a wide top-hung swing when it is needed. And a purpose-made escape unit opens well past forty five degrees so the sash lies close to the roof surface.

A plain centre-pivot window does not qualify, because the reversed sash crosses the middle of the aperture. The mechanism comparison in full is on centre-pivot and top-hung roof windows compared.

Sizes that reach the figures, and sizes that never will

Take the narrowest common width in the standard grid, around 550 millimetres of unit width. Once the frame is deducted, the clear width is under 450 millimetres before the sash is even considered. That size cannot be an escape opening in any mechanism.

In practice the escape duty pushes the specification towards a wider unit, commonly 780 millimetres and often 940, with a height that gets the area past 0.33 square metres once the sash is clear. The coding behind those widths is explained on roof window sizes and how they are coded.

Requirement Figure Measured from
Clear openable area 0.33 square metres minimum The aperture with the sash held clear
Clear height 450 mm minimum Within the opening plane
Clear width 450 mm minimum Within the opening plane
Bottom of opening 600 to 1100 mm Finished floor level below

The 1100 millimetre line, and the floor it is measured from

Finished floor level means the floor people will stand on, with the boards, the insulation build-up and any floor covering in place. On a loft conversion that surface often ends up sixty or eighty millimetres higher than the joist tops the carpenter is working off, and a window set out from the joists can end up outside the band.

The other half of the measurement is the roof pitch. On a shallow slope the bottom of the window sits further out horizontally for the same height above the floor, and on a steep one it sits closer to the wall. Setting the unit out from a section drawing rather than from a tape held on a rafter is what keeps the figure honest.

Loft conversions, and the 4.5 metre threshold

The escape window route works where the floor of the new storey is not more than 4.5 metres above external ground level. That covers the great majority of two-storey houses converting a loft.

Go above 4.5 metres, which is typical where a third storey is being formed or where the ground falls away at the back, and an escape window is no longer accepted as the primary means of escape. The design then turns on a protected stair enclosure running down to a final exit, with fire doors and the associated construction. That is a design decision taken at the start of the project, because it changes doors, linings and the stair itself.

Inner rooms, and the window that serves them

An inner room is common in Essex loft conversions where a shower room or a study has been carved out behind a bedroom. If the only route out passes through another habitable room, the inner room needs its own escape opening.

Bathrooms and shower rooms are treated differently from habitable rooms and do not carry the same duty, which is worth knowing before a window is specified for a loft en-suite that never needed to be an escape unit. Getting that distinction right at design stage often saves a wider window in a slope that did not have room for it.

Where the opening actually puts you

The regulation asks that the opening leads to a place free from danger, which for a roof window means the roof slope outside and then, in a real event, a rescue from a ladder or an appliance. It is not assumed that an occupant climbs down unaided.

What this rules out is an escape window discharging into an enclosed light well, an internal courtyard with no route out, or onto a slope directly above a conservatory roof that would not hold anyone. On a terraced street in the older parts of Colchester or Maldon, where rear additions stack up against each other, that check is worth doing on site rather than on a plan.

Pitch, and how it changes what the sash does

Escape units carry a pitch range like any other roof window, and the escape function usually narrows it. On a very shallow slope the sash has to be pushed a long way to leave the aperture clear, and on a steep one it swings hard and needs restraining.

The common band for an escape-hinged unit runs from around fifteen degrees to the mid fifties. Victorian rear additions in Chelmsford frequently exceed that at the main slope, so the escape window often lands in the shallower part of the roof or in a dormer cheek instead. That constraint is one to test at survey, before the room layout is drawn around a window position.

Daylight from a single large rooflight over a kitchen extension
Daylight from a single large rooflight over a kitchen extension

Guarding, and what Part K asks nearby

Part K deals with protection from falling. Where the bottom of a window opening is low in a room at height, guarding is required unless the window itself is designed to restrain a fall. For roof windows the 600 millimetre lower limit in the escape band already keeps the opening above the level at which the question usually arises.

The interaction to watch is with a low internal cill or a fitted seat under the window, which effectively raises the floor and lowers the opening relative to it. Where that appears in a design, the guarding question is answered at the drawing stage.

Catches, locks and how the window is operated in a hurry

An escape opening has to be openable without a key, from inside, by someone who has never practised. Any locking or restrictor arrangement has to release as part of the same movement rather than needing a separate step in the dark.

How that interacts with child safety, and the catch positions available on modern sashes, is covered on roof window handles, catches and child safety. For the escape question the test is simply whether an adult woken at three in the morning can operate the window in one movement.

Older units already in Essex loft slopes

Loft conversions carried out in the eighties and nineties across the commuter towns are full of roof windows that were never escape units and would not meet the current figures. That is not automatically an issue, because the standard applied is the one in force when the work was done.

It becomes live at two moments. When the room is altered or the conversion is extended, the current standard applies to the work. And when the window itself has reached the end of its life, a replacement into that opening is the natural point to bring it up to the escape figures if the structural opening can take a wider unit.

How the opening is signed off

Escape provision is checked by Building Control as part of the wider approval for the work, alongside the thermal and structural elements. The inspector wants the opening dimensions, the height above finished floor and the mechanism, and on a conversion those are checked against the drawing on site.

Sunspire handles the notification for the rooflight element as part of the job. Where the window sits inside a wider loft conversion under its own approval, the window details are passed to whoever is running that application so the escape figures appear in one place rather than two.

Fitting the escape unit into the roof structure

An escape window is usually wider than the unit that would otherwise have been chosen, and width is what costs structure. A 940 millimetre unit needs an opening a little over a metre across, which on rafters at 400 centres means two rafters cut and a trimmed frame formed around them.

On the trussed roofs of Great Notley, South Woodham Ferrers and Beaulieu Park, cutting two webs is not a decision made with a saw in hand. It wants a structural design, and it is the reason an escape window on a modern estate roof sometimes lands in the gable end or in a dormer instead. The carpentry itself is set out on roof window installation.

Getting the question settled early

The order that works is straightforward. Establish whether the room is habitable and which storey it is on. Confirm the floor level and the 4.5 metre check. Then pick a unit whose published escape clear opening exceeds the figures with something in hand, rather than one that meets them exactly on a drawing and misses them on site by the thickness of a floor build-up.

Do that in the first conversation and the window position, the structural opening and the flashing kit all fall out of it in the right order. Leave it until the roof is open and the choice narrows to whatever the merchant has in stock.

Keep reading

More on velux window installation

All about velux window installation →

Get a quote

Tell us about your roof

We start with the building, the covering and the slope. Then we tell you what will suit it, and what it will cost, as a fixed written number.

  • Surveyed before it is priced
  • 10-year workmanship guarantee
  • Building Control notification handled
  • New installations and replacements
Get a quote Call us