Can you convert a manual rooflight to electric?
Sometimes, and the answer is decided by the frame rather than by the roof. If the unit already opens, and the manufacturer makes a retrofit drive for that exact model, the conversion is straightforward work from inside the room. If the unit is fixed, or the model is long discontinued, or the profile has no fixing point at the head, there is nothing for an actuator to mount to and the route is a new opening unit instead.
This page works through which of those cases you are in and what each one involves. The wider subject sits on electric rooflight installation.
The first test: does the pane already move
A fixed rooflight cannot be made to open. The sash is not a sash, it is glazed directly into the frame with tape and a bead, there are no hinges and no gasket, and the frame profile was never designed to carry a moving joint.
People ask this often enough that it is worth stating plainly. Cutting an existing fixed unit about to create an opening pane is not achievable in any sensible way, and the honest route to an opening rooflight in that position is a new unit into the existing kerb or opening. That is frequently a single day’s work and it is a good moment to improve the glazing at the same time, which is covered on skylight replacement.
Manufacturer kits, and why the model number matters
Several manufacturers make retrofit drives for their own manual sashes. The kit is a matched set: a bracket that screws to a specific point on that frame profile, an actuator sized for that sash, and a control unit and switch to suit.
The reason the model number matters is that the bracket is transferring the whole closing force into the frame at one fixing position. Manufacturers pick that position because the profile is reinforced there. A generic drive bolted wherever there is room puts a cyclic load into a section of extruded aluminium or a timber rail that was never intended to take it, and the fixings work loose long before the motor does.
Age, and the point at which a kit no longer exists
Retrofit availability tends to run for the life of a range plus a few years beyond it. On a unit fitted in the last decade there is usually something. On a twenty year old roof window there often is not, and on the domed polycarbonate units fitted across Essex in the seventies and eighties there certainly is not.
Age matters for a second reason. A sealed unit has a working life of roughly twenty to twenty five years, and hinges and gaskets age alongside it. Fitting a new drive to a sash whose gasket has hardened and whose glass is close to misting is money spent on the wrong half of the assembly.
Whether the sash will take the force
An actuator does not simply nudge a pane open. It has to pull it back down and compress the gasket to a specified squeeze, every cycle, and hold it there against wind uplift.
Three things get checked before a conversion is quoted. The hinges, because a manual sash that has been opened by hand for fifteen years may have play in it that a motor will find immediately. The gasket, pressed with a thumb to see whether it still springs back. And the frame itself at the proposed bracket position, because a timber rail that has taken any moisture will not hold a fixing under repeated load.
Finding a cable route through a finished ceiling
This is where most conversions actually get decided, and it has nothing to do with the rooflight.
On a pitched slope with an unconverted loft above, the run is easy: down the rafter void to a convenient point. In a room-in-roof conversion the plasterboard is already on and the void is insulated and closed. On a flat roof with a cold deck there is a ceiling void to work in. On a warm deck, where the insulation sits above the structural deck, there is often no void at all. The mains half of that question is covered on whether electric rooflights need an electrician.
Solar retrofit, the route with no cable
Where no concealed route exists, a solar retrofit kit is the practical answer rather than a consolation. The panel mounts on the outside of the frame, the cell and the control electronics sit inside it, and a wireless handset or wall plate does the switching.
Two things are worth knowing. The panel needs a reasonable view of the sky, so a unit shaded most of the day by a neighbouring wall or a mature tree will charge slowly. And the drives on solar kits are generally rated for lighter sashes than their wired equivalents, because a cell has a finite budget per cycle. A heavy triple glazed pane is where solar starts to struggle.
What the conversion day actually involves
A manufacturer kit onto a compatible sash is short work and almost all of it happens from inside. The room below is protected, the internal trim comes off, the bracket is fixed to the sash and the actuator to the frame, the low voltage cable is terminated at the head, and the trim goes back.
Then the part that decides whether it lasts: setting the limits. The drive is run through several full cycles and adjusted until it stops cleanly at the open end and pulls the sash tight against the gasket at the closed end without labouring through the final few millimetres. A drive that is not quite driving home is the origin of most later complaints about a converted unit.
Deciding between a conversion and a new opening unit
| Existing unit | Sensible route |
|---|---|
| Recent model, opens by hand, kit available | Manufacturer retrofit drive |
| Opens by hand, no cable route | Solar retrofit kit |
| Fixed unit, no opening pane | New opening unit into the existing kerb |
| Discontinued model or frameless flush design | New opening unit into the existing kerb |
| Misting glass or hardened gasket | New opening unit, with upgraded glazing |
The survey settles which row applies by reading the model plate, testing the sash by hand and looking for a cable route. That is usually a short visit and it turns the question into a fixed written figure rather than a maybe.
Related questions
Tell us about your roof
We start with the building, the covering and the slope. Then we tell you what will suit it, and what it will cost, as a fixed written number.
- Surveyed before it is priced
- 10-year workmanship guarantee
- Building Control notification handled
- New installations and replacements